Production Workflow

From Concept Creation to On-Time Bulk Delivery

1. Trend & Design

  • Seasonal trend analysis and concept development

  • Moodboard creation, fabric planning and fit direction

  • Fast samples

24-48 hrs turnaround response time (depending on project requirements)

2. Sampling & Fitting

  • Fast sampling cycle supported by experienced technicians

  • Professional fitting sessions with pattern refinement

  • Structured approval process for accurate pre-production

First prototype in 5–7 days

3. Material Sourcing

  • China-based integrated sourcing ecosystem for fabrics and trims

  • Strong network specialized in active, seamless, rib, soft-touch, and swim materials

  • Rapid sourcing support with flexible MOQ

4. Bulk Production

  • Stable manufacturing capacity across partnered factories in China

  • Flexible MOQ starting from 300 pcs/style Ready-stock fabrics

  • Strict production planning ensuring reliable on-time delivery

Standard production lead time: 30 days for fabric+30 days for production

5. Quality Control

  • On-site QC team conducting inline, pre-final and final inspections

  • AQL-based evaluation and defect tracking system

  • Full packaging QC and shipment verification before dispatch

AQL 2.5 standard

6. Solution / alternatives update

  • On-site QC team conducting inline, pre-final and final inspections

  • AQL-based evaluation and defect tracking system

  • Full packaging QC and shipment verification before dispatch

AQL 2.5 standard